album1001006.jpg
Department of
album1001005.jpg
Research Projects
7. "ICT in Water and Pest/Disease Management for Yield Improvement in Horticulture (Citrus)" Co-Principal Investigator, Funded by IT Research Academy (ITRA-Water), Media Lab Asia, Ministry of Communication and Information Technology, Government of India.
Project Lead: Prof. J. Adinarayana, CSRE, IIT Bombay
Project Cost: Rs. 214,47,000; IIT-H Share: Rs. 62,65,000 Project Duration: 3 Years.
Status: On going (started in November 2013)

6. "An investigation into the fate and transport of non-point source pollution in a semi-arid tropical region using a physical process model" Principal Investigator, Funded by Ministry of Science and Technology (Fast Track Scheme), Government of India.
Project Cost: Rs. 8,12,000; Project Duration: 2.5 Years.
Status: On going (started in June 2013)

  1. "Geo-spatial based groundwater quality and vulnerability modeling in a semi-arid region of Rajasthan, India"
Principal Investigator, Funded by INCGW, Central Ground Water Board, Ministry of Water Resources, Government of India.
Project Cost: Rs. 23,94,000; Project Duration: 2 Years.
Status: On going (started in August 2013)

4. "Digital hydro-geologic framework model of the Mesilla Bolson, New Mexico, U.S.A. "
Funded by the Office of the State Engineer, New Mexico, U.S.A.
Project Cost: US $ 22,000; Project Duration: 2 1Year (2009-10).
Status: Completed. Draft Report submitted to New Mexico Water Resources Research Institute, U.S.A.

3. "Effect of elevation variability on evapotranspiration estimates using MODFLOW."
Student Researcher, Funded by NM WRRI, U.S.A. (Student Research Grant).
Project Cost: US $ 5,000; Project Duration: 1 Year (2008-09).
Status: Completed. Technical Documentation submitted to New Mexico Water Resources Research Institute, U.S.A.

2. "Digital hydro-geologic framework model of the San Francisco River Basin, East Central Arizona – West Central New Mexico, U.S.A."
Funded by Gila-San Francisco Water Commission, Arizona, U.S.A.
Project Cost: US $ 35,000; Project Duration: 1 Year (2008-09).
Status: Completed. Technical Report submitted to New Mexico Water Resources Research Institute, U.S.A.
For details, visit: http://wrri.nmsu.edu/publish/techrpt/tr354/tr354.pdf

1. "Simulation of Groundwater Flow in the Southern Jornada del Muerto Basin, New Mexico, U.S.A."
Funded by Lower Rio Grande Water Users Organization, New Mexico, U.S.A.
Project Cost: US $ 75,000; Project Duration: 2 Years (2007-09).
Status: Completed. Technical Report submitted to New Mexico Water Resources Research Institute, U.S.A.
For details, visit: http://wrri.nmsu.edu/publish/techrpt/tr352/tr352.pdf
K.B.V.N.Phanindra
Assistant Professor
Department of Civil Engineering
Email: phanindra@iith.ac.in
Phone: +91 40 2301 6117
Consultancy Projects
  1. "Hydro-Geologic and Water Quality Modeling, and Technical Support to SuGWM Project Actions - A Case of 6 Gram Panchayats in Andhra Pradesh", Funded by Centre for World Solidarity (CWS) through Bread for the World (BfdW) and European Union (EU)
Project Cost: Rs. 18,00,000 Project Duration: 18 Months.
Status: Final Report under Preparation